Trident Risk Management Awarded Study Work for Perla Development Offshore Venezuela

Posted on: April 5th, 2011 by Muze Development

Trident Risk Management

Trident Risk Management Awarded Study Work for Perla Development Offshore Venezuela

Date: April 5, 2011

HOUSTON – Trident Risk Management, LLC™ today announced an award by Foster Wheeler USA Corporation for a work scope including a Reliability, Availability & Maintainability (RAM) analysis, a marine vessel collision risk assessment, an infield flowline risk assessment, and the Layers of Protection Analysis (LOPA) for offshore and onshore facilities as part of front-end engineering design (FEED) for the Perla Field Early Production Development Project.

The Perla Field is a world class non-associated natural gas discovery situated in the Cardon IV block, Gulf of Venezuela. Foster Wheeler Upstream, a division of Foster Wheeler AG’s Global Engineering and Construction Group, has been performing pre-FEED and FEED work for Cardon IV S.A. under a contract announced in October 2010.

The study work by Trident Risk Management is an extension of the engineering and business consulting firm’s work as loss prevention engineer and risk expert developing the Project Risk Register and Project Risk Management Plan, and leading Process Hazards Analyses (PHAs), during the Pre-FEED and FEED stages on the Perla Project.

SOURCE: Trident Risk Management, LLC
www.TridentRMLLC.com
Contact: Jim Vopelius, 281-854-2148
Jim.Vopelius@TridentRMLLC.com


Comments are closed.